The Kitchen Remodel Continues

Things slowed down last week on the kitchen remodel. The electricians worked all day Monday, but little else was done last week beyond some planning. The electricians had originally planned to work last Tuesday, too, but plans changed. And then there was the holiday weekend, so everything came to a screeching halt. But now the work is back in full swing.

Remember when I mentioned being concerned about the rusty cast iron pipe that was exposed when the kitchen ceiling came down?

DSC05324

You never know what you will find when you open the walls of an old house.

Well, after talking to the plumber, we decided to have it replaced while the walls are open. Better safe than sorry, know what I mean? I’d much rather spend a few hundred dollars now rather than thousands after the kitchen is finished. The pipe may have held up for decades, but if it had cracked or burst two months, or two years, or even ten years down the road, we would be kicking ourselves for not having taken care of it when it when the walls and ceiling were open.

Fortunately, the plumber was able to replace what needed to be replaced without having to do anything to the bathroom except remove, then reinstall the toilet.

 

The new pipes and fittings won't rust.

The new pipes and fittings won’t rust.

If this had cracked or ruptured, it would have been a real mess.

If this had cracked or ruptured, it would have been a real mess.

Next up–fixing the kitchen floor, insulation, the range hood vent, and drywall. The old hardwood will be coming up and a new subfloor will be laid to prepare the floor for porcelain tile. The exterior wall behind the sink will be insulated, the vent for the range hood will be installed, then drywall will go up. I’m really happy that the range hood can be vented outside. I’ve lived with recirculating range hoods for a long time, and they really don’t do much except provide lighting, contain some of the cooking grease, and keep the smoke detector from going off, sometimes. I think this week will be a productive one.

Advertisements

4 thoughts on “The Kitchen Remodel Continues

  1. Definitely a good idea to replace the pipe now than later. Oh I would like a range hood that vents outside 🙂

    • When you open up the walls of an old house, you kind of expect to incur a few extra costs because you just know you are going to find something that need to be address. I’m just happy we didn’t find any asbestos. 🙂

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s