Week Fifteen And Still Counting

I thought you might like to see the progress made this week, the 15th of our 3-4-week kitchen remodel.

Screen Shot 2015-10-02 at 7.40.39 PM

Yep, for the 3rd week in a row, nothing has been done. We haven’t seen hide nor hair of our contractor, although someone did come last week to measure for the countertops. Our contractor told us that our job isn’t as important as the work he is doing for a builder he regularly works for, although he didn’t word it exactly that way. What he said is that he is finishing up some jobs for a builder who keeps him working during the winter. Same difference.

I don’t expect we’ll see him until the countertops have been installed, and maybe not even then. I had hoped the kitchen would be finished by Halloween, but that doesn’t seem likely, so now I’m hoping for Thanksgiving. Yes, it looks like our simple kitchen remodel is going to take longer than it took to build our previous house. 😦

 

Advertisements

One thought on “Week Fifteen And Still Counting

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s